色婷婷五月综合亚洲小说-国产精品久aaaaa片-在线亚洲97se亚洲综合在线-欧美三级午夜理伦三级-亚洲超清无码制服丝袜无广告

PE water supply pipe

¥0
Inquire Now
Hubei AD Building Materials (17399989993) produces PE100 grade water supply pipes, which comply with GB/T13663-2018 standards, provide DN20-DN1600 full-specification pipes, support hot melt/electric fusion connection, 50...
Product details

PE water supply pipe product introduction

product introduction

PE water supply pipes and fittings are produced with PE100 or PE80 as raw materials. The specifications, size and performance meet the requirements of GBT13663-2018 and GB/T13663.2-2018 standards. The sanitary performance meets the GB/T 17219 standard and the relevant health and safety evaluation regulations of the Ministry of Health of the People's Republic of China. PE water supply pipes have the characteristics of good flexibility, strong corrosion resistance, light weight and excellent impact resistance. Pipe and pipe fittings can be connected by hot melt socket, hot melt butt and electric fusion, so that the pipes and pipe fittings are fused into one. The system is safe and reliable, and the construction cost is low. It develops rapidly in engineering applications.

product features

1. Long service life. Under normal conditions, the minimum life is 50 years

2. Good hygiene. PE pipe is non-toxic, does not contain heavy metal additives, does not scale, and does not breed bacteria. It solves the problem of secondary pollution of drinking water. In line with GB/T17219 safety evaluation standards and relevant health and safety evaluation regulations of the Ministry of Health.

3. It can resist corrosion of various chemical media; no electrochemical corrosion.

4. The inner wall is smooth, the friction coefficient is extremely low, the medium's passing ability is correspondingly improved and it has excellent wear resistance.

5. Good flexibility, high impact strength, strong shock resistance, distortion

6. Light weight, convenient transportation and installation.

7. Unique electric fusion connection and hot melt docking, hot melt socket connection technology makes the interface strength higher than the pipe body, ensuring the safety and reliability of the interface

8. The welding process is simple, the construction is convenient, and the comprehensive cost of the project is low.

product application range:

municipal water supply system, building water supply system and buried water supply system in residential area, industrial and water treatment pipeline system.

Product specifications:

PE water supply pipethe1page

Pipeline connection:

1. The main connection methods of the pipeline are:

(1) dns63, hot melt socket connection or electrofusion connection;

(2) dn275, hot melt butt or electrofusion connection should be used;

(3) The connection with metal pipes and pipeline accessories can be connected by flange connection or transition pipe fittings.

2. When using this method to connect the hot melt socket, using a hot melt welding machine, the specific steps are as follows:

①, check the surface quality of the pipe, the connection part is clean and non-destructive, and the flat surface of the fracture is smooth and free of burrs.

②, measure the depth of the socket, and mark it on the surface of the pipe.

③, the nozzle is treated with a special scraper on the surface of the pipe connection part to ensure that the periphery is a new surface layer, the mouth should be chamfered, the groove should be 30, the surface groove length is not more than 2.0mm.

④, the pipe fitting socket surface is wiped with a dry cloth to clean the surface.

⑤, insert the pipe and the pipe fitting into the heater without rotation at the same time to heat the connection part.

(6), heated to a predetermined time, pull out the pipe, pipe fittings, quickly and smoothly and uniformly push the pipe into the pipe fitting socket, forming a flange ring around the socket.

0006, pipe, pipe fittings exceed the specified cooling down before the next step.

3. When the hot melt butt

using this method of connection, using hot melt butt welding machine, the specific steps are as follows:

①, prepare the required tools.

②, the pipe to be connected is placed on the welding machine fixture and clamped, clean the pipe to be connected and milling the connecting surface, straighten the two pairs of connectors, so that the amount of dislocation is not greater than 10% of the wall thickness.

③, put into the heating plate to start heating, heating is completed, take out the heating plate, quickly join the two heating surfaces, boost to the welding pressure and pressure cooling.

4. Electrofusion connection

①, clean the dirt on the surface of the pipe to be connected, mark the insertion depth.

②, scrape off the skin.

③, the electrofusion pipe is sleeved on the pipe, and the pipe is straight to ensure that it is on the same axis.

④ Electricity welding, there should be a little melt ejection in the hole to be observed.

⑤ Cooling, electrofusion is completed.


Inquire Now

主站蜘蛛池模板: 欧美激情猛片xxxⅹ大3| av无码免费岛国动作片不卡| 亚洲国产美国国产综合一区| 国产成人无码免费看视频软件| 国产精品欧美久久久久久日本一道 | 大肉大捧一进一出视频出来呀| 亚洲精品国产第一区二区尤物 | 欧美视频区高清视频播放| 欧美另类 自拍 亚洲 图区| 天天爱天天做天天爽夜夜揉| 成人做爰100部片免费下载 | 亚洲国产成人精品无码区在线网站| 2019日韩中文字幕mv| 性无码免费一区二区三区屯线| 无码人妻久久一区二区三区免费丨| 亚洲精品亚洲人成在线观看| 成人高清无码| 日欧一片内射va在线影院| 国产精品一区二区久久精品| 亚洲 国产 韩国 欧美 在线| 人与禽交av在线播放| 一夲道av无码无卡免费| 国产网红无码精品福利网| 亚洲精品乱码8久久久久久日本| 国产精品久久久一区二区| 野狼av午夜福利在线| 久久人人97超碰国产亚洲人 | 中文字幕无码免费不卡视频| 亚洲字幕av一区二区三区四区| 国产极品女主播国产区| 久久久久国产精品人妻电影| 日本丶国产丶欧美色综合| 国产av激情久久无码天堂| 欧美性色19p| 日本少妇被黑人xxxxx| 亚洲精品乱码久久久久66| 欧美三级真做在线观看| 亚洲精品一区二区国产精华液| 又色又爽又高潮免费视频观看| 国产麻豆剧果冻传媒白晶晶| 色777狠狠狠综合|