How to Achieve Effective Construction of HDPE Double Wall Corrugated Pipe

2025-03-21

First, the AD brand HDPE double-wall corrugated pipe is strictly prohibited from throwing Zheng, towing and rolling and hitting each other.

pipes should be placed in the shed if they are stored for a long time. When stacked in the open air, they must be covered to prevent sun exposure and keep away from heat sources. Pipe storage time should not be greater than 12 months. Pipes that have exceeded 12 months should be re-tested when used, and those that fail the test should not be used. Pipe stacking height should not be too high to prevent the lower pipes from being compressed and deformed.

How to Achieve Effective Construction of HDPE Double Wall Corrugated Pipethe4page

Second, the excavated section of the AD pipeline trench should meet the requirements of

. The original foundation soil at the bottom of the groove should not be disturbed. The bottom of the mechanical excavation groove should be reserved for 200~ 300mm soil layer from manual excavation to the design elevation and leveling; the bottom of the trench is strictly prohibited from being soaked in water or frozen, otherwise the foundation should be strengthened.

Before connecting the pipeline, check whether the rubber ring is well matched and supplied by the pipe manufacturer. The appearance of the selected rubber ring should be flat and smooth, and no defects such as pores, cracks, wrinkles, damage, and heavy skin are allowed.

Confirm that the rubber ring is placed in an accurate position. The correct position of the rubber ring installation should be between the second and third ripples of the interface. The number of rubber rings installed depends on the design requirements. When using two rubber rings, it is recommended that there be a ripple between the two rubber rings. When working on the interface, the inner working surface of the socket and the outer working surface of the socket should be cleaned up first. It is strictly forbidden to have soil and other sundries. Lubricant should be applied to the inner working surface of the socket and the surface of the rubber ring (usually soapy water is enough).

According to the insertion direction as the water flow direction, a wooden baffle can be set at the end of the pipe, and the installed pipe can be slowly inserted into the socket along the aligned axis with a crowbar, and installed one by one. Pipes with a pipe diameter of 400ram can be tied with flexible cables. With manual hoists and other lifting tools, it is strictly forbidden to use construction machinery to forcibly push the top pipe into the socket. After the installation is completed, check whether the key socket is inserted in place.

How to Achieve Effective Construction of HDPE Double Wall Corrugated Pipethe2page

the foundation of the inspection well should be built on the original soil, when the original soil foundation is soft or disturbed, the foundation treatment should be carried out according to the design and specification requirements; the concrete foundation of the inspection well should be poured with the pipeline foundation colleagues to prevent uneven settlement of the pipeline and the inspection well; the block should be fully wet before the inspection well masonry, and the cement mortar base of the HDPE double-wall corrugated pipe should be full and dense during masonry.

inspection well masonry, masonry cement mortar strength should meet the design requirements, the slurry should be full, mortar and block around the adhesion should be close, no slurry leakage, the upper and lower blocks should be staggered masonry; support, connected pipe access inspection well room, should be installed in the well room construction at the same time reserved support, connected pipe, reserved pipe diameter, direction, elevation should meet the design and specification requirements, pipe and well wall connection should be tight; inspection well reserved pipe mouth should be used low-strength mortar masonry seal smooth; well wall plastering surface should be dense and flat, strictly prohibited hollow drum, cracks and other phenomena.

How to Achieve Effective Construction of HDPE Double Wall Corrugated Pipethe3page

4, closed water test pass

pipeline construction end should be timely closed water test. Before the water closure test, the appearance quality of the pipeline and inspection well should be accepted and qualified, and the pipeline has not been backfilled, and there is no water accumulation in the trench. All reserved holes should be plugged and no water seepage should be allowed.

When the upstream design water head of the test section should not exceed the inner wall of the pipe top during the water closure test of the pipeline, the test water head should be measured by adding 2m to the inner wall of the upstream pipe top. When the upstream design water head of the test section exceeds the inner wall of the pipe top, the test water head should be measured by adding 2m to the upstream design water head of the test section. The test water head at the calculation is less than 10m, but when it has exceeded the wellhead of the upstream inspection well, the test water head should be based on the height of the upstream inspection wellhead.

When the pipeline is closed for water testing, an appearance inspection should be carried out to strictly prohibit water leakage. When the water head reaches the required height, check the brick plugging, pipe body, and well body for water leakage. If there is serious leakage, it should be plugged. After soaking for 24h, observe the water seepage again. The measurement time of the water seepage should not be less than 30min. Correctly calculate the water seepage. The measured water seepage should be less than or equal to the allowable water seepage specified in the "Water Supply and Drainage Pipeline Construction and Acceptance Code" (GB50268-2008).

5, backfill quality control pass

pipeline closed water test, should be backfilled in time, backfill should check the pipeline before damage or deformation, damaged pipeline should be repaired or replaced; pipeline groove backfill when the groove must not have bricks, stones, wood and other debris, the groove is strictly prohibited from water, is strictly prohibited with water backfill.

The soil quality of the backfill should meet the design and specification requirements. Within the range of 500ram from the bottom of the tank to the top of the pipe, the backfill must not contain organic matter, frozen soil, and debris such as broken bricks, stones, and concrete fragments greater than 50ram. The water content of the backfill should be controlled within the range of 2% of the optimum moisture content according to the soil type and the compaction tools used. The effective support angle range of the pipeline should be filled with medium coarse sand and dense, in close contact with the pipe wall, and cannot be filled with soil or other materials.

The backfill materials on both sides of the pipeline and within the 500mm range above the top of the pipe should be transported symmetrically from both sides of the groove. It is strictly forbidden to backfill directly on the pipeline. When backfilling other parts, they should be evenly transported into the groove. It is strictly forbidden to push in centrally; when backfilling below the pipe radius, measures should be taken to prevent the pipeline from floating and displacing; when backfilling the pipeline, it should be layered symmetrically backfilled from both sides of the pipeline and tamped at the same time. The virtual floor thickness of each layer of backfill soil should be carried out according to the "Code for Construction and Acceptance of Water Supply and Drainage Pipeline Engineering" (GB50236-2008).

How to Achieve Effective Construction of HDPE Double Wall Corrugated Pipethe4page

4 Source: Hubei AD Building Materials Co., Ltd., welcome to share! If you have AD pipe procurement needs, you can contact us.


主站蜘蛛池模板: 日韩高清亚洲日韩精品一区二区三区 | 永久中文字幕免费视频网站 | 亚洲国语自产一区第二页| 2019亚洲午夜无码天堂| 亚洲综合色在线视频www| 九九视频在线观看视频6| 亚洲中文av一区二区三区| 国产在沙发上午睡被强| 最新国产精品亚洲| 久久精品国产亚洲欧美成人| 久久精品中文字幕有码| 日韩精品无码综合福利网| 日韩午夜无码精品试看| 欧美另类videosbestsex日本| 色五月丁香六月欧美综合| 强插女教师av在线| 久久无码中文字幕免费影院| 亚洲精品久久久久久偷窥| 丁香婷婷激情综合俺也去| 午夜视频体内射.com.com| 欧美日韩一区二区综合| 无码中文字幕热热久久| 日韩丰满少妇无码内射| 免费观看国产小粉嫩喷水精品午.| 果冻传媒av精品一区| 亚洲综合电影小说图片区| 韩国的无码av看免费大片在线| 女人高潮被爽到呻吟在线观看| 99久久精品无码一区二区毛片| 99久久国产综合精品swag| 国产思思99re99在线观看| 久久99精品国产99久久6尤物 | 起碰免费公开97在线视频| 亚洲精品久久久久久偷窥| 45分钟免费真人视频| 亚洲日韩欧美内射姐弟| 欧洲精品免费一区二区三区| 三上悠亚在线精品二区| 2022国产在线无码精品| 无码国产精品一区二区高潮| 国产人妻人伦精品婷婷|