Detailed explanation of trench excavation width of bellows

2025-04-25

In the construction of pipeline engineering, the determination of the excavation width of the bellows trench is very important, which directly affects the installation quality and subsequent use safety of the pipeline. Generally speaking, the excavation width of the bellows trench can be determined according to the specific conditions of each region, but in order to ensure the normal operation of the construction specification and pipeline, there is a general reference standard, that is, the net width of each side of the pipeline should not be less than 300 mm.

Different specifications of bellows trench excavation width

How wide the trench needs to be dug for the bellows of 600 specifications: For the bellows of 600 specifications, according to the standard of the net width of each side not less than 300 mm, the trench excavation width should be at least 600 (pipe diameter) + 3002 = 1200 mm. However, in actual construction, if there are special geological conditions, other ancillary facilities need to be installed or construction operation space is considered, it may be necessary to widen appropriately.

how wide the trench should be dug for the pre-embedded bellows 300:300 specifications of pre-embedded bellows, the trench excavation width is at least 300 (pipe diameter) + 3002 = 900 mm. Similarly, in complex construction environments, such as rich groundwater and soft soil, it is necessary to increase the width to ensure the stability and construction safety of the trench.

how wide the trench is dug for the 300 bellows: Similar to the pre-embedded 300 bellows, the conventional excavation width is at least 900 mm. However, if it is in a narrow construction area, and the construction technology is mature and the support measures are in place, the width can be appropriately reduced under the premise of meeting the requirements of construction operation and pipeline installation, but it must not be lower than the minimum standard of the specification.

400 sewage bellows need how deep the trench: The buried depth of the sewage bellows is not only related to the pipe diameter, but also affected by factors such as the depth of the frozen soil layer, the ground load, and the connection of the municipal pipe network. Generally in non-frozen soil areas, the top covering depth of the 400 sewage bellows pipe should not be less than 0.7 meters; in frozen soil areas, it needs to be buried below the frozen soil layer. At the same time, it is necessary to ensure a safe distance from other underground pipelines to avoid mutual interference.

bellows grooving allowable deviation and side width

bellows grooving allowable deviation is clearly stipulated in different specifications, usually the bottom of the groove elevation allowable deviation of 20 mm, the bottom of the groove width to meet the above requirements of each side of the net width of not less than 300 mm, and to ensure that the trench straight, the slope on both sides of the design and geological conditions. On the side of the bellows digging how wide, in addition to meeting the net width of 300 mm on each side, if it involves pipeline interface treatment, waterproof measures, etc., also need to increase the width according to the actual process requirements to ensure that the construction operation space is sufficient.

Detailed explanation of trench excavation width of bellows第1張

主站蜘蛛池模板: 国产精品成人嫩草影院| 欧美日韩一区二区三区视频播放 | 粗大的内捧猛烈进出少妇视频| 无码av免费一区二区三区试看 | 国产成人精品午夜福利a| 婷婷色香合缴缴情av第三区| 天干天干天啪啪夜爽爽99| 18禁在线永久免费观看| 日韩精品无码区免费专区| 精品人人妻人人澡人人爽人人| 国产精品久久久一区二区| 99久久99久久免费精品蜜桃| 大ji巴好深好爽又大又粗视频| 亚洲国产av玩弄放荡人妇系列| 亚洲日韩国产欧美一区二区三区 | 亚洲成色在线综合网站| 精品国产精品三级精品av网址| 久久人爽人人爽人人片av| 大色欧美| 亚洲精品人成无码中文毛片| av永久免费网站在线观看 | 欧美黑人与白人精品a片| 午夜电影网va内射| 国产精品视频第一区二区三区| 国产日韩欧美久久久精品图片 | 亚洲大码熟女在线观看| 日产幕无线码三区在线| av狼友无码国产在线观看| 亚洲人成电影在线天堂色| 国产久久精品| 日本做受高潮好舒服视频| 亚洲精品一区二区三区的| 亚洲线精品一区二区三八戒| 免费看男女做爰爽爽视频| 亚洲免费人成视频观看| 天天做天天爱天天做天天吃中| 婷婷五月综合国产激情| 肉色欧美久久久久久久免费看 | 久久熟女| 免费看一区二区三区四区 | 亚洲自偷自偷在线成人网址|