Detailed explanation of trench excavation width of bellows

2025-04-25

In the construction of pipeline engineering, the determination of the excavation width of the bellows trench is very important, which directly affects the installation quality and subsequent use safety of the pipeline. Generally speaking, the excavation width of the bellows trench can be determined according to the specific conditions of each region, but in order to ensure the normal operation of the construction specification and pipeline, there is a general reference standard, that is, the net width of each side of the pipeline should not be less than 300 mm.

Different specifications of bellows trench excavation width

How wide the trench needs to be dug for the bellows of 600 specifications: For the bellows of 600 specifications, according to the standard of the net width of each side not less than 300 mm, the trench excavation width should be at least 600 (pipe diameter) + 3002 = 1200 mm. However, in actual construction, if there are special geological conditions, other ancillary facilities need to be installed or construction operation space is considered, it may be necessary to widen appropriately.

how wide the trench should be dug for the pre-embedded bellows 300:300 specifications of pre-embedded bellows, the trench excavation width is at least 300 (pipe diameter) + 3002 = 900 mm. Similarly, in complex construction environments, such as rich groundwater and soft soil, it is necessary to increase the width to ensure the stability and construction safety of the trench.

how wide the trench is dug for the 300 bellows: Similar to the pre-embedded 300 bellows, the conventional excavation width is at least 900 mm. However, if it is in a narrow construction area, and the construction technology is mature and the support measures are in place, the width can be appropriately reduced under the premise of meeting the requirements of construction operation and pipeline installation, but it must not be lower than the minimum standard of the specification.

400 sewage bellows need how deep the trench: The buried depth of the sewage bellows is not only related to the pipe diameter, but also affected by factors such as the depth of the frozen soil layer, the ground load, and the connection of the municipal pipe network. Generally in non-frozen soil areas, the top covering depth of the 400 sewage bellows pipe should not be less than 0.7 meters; in frozen soil areas, it needs to be buried below the frozen soil layer. At the same time, it is necessary to ensure a safe distance from other underground pipelines to avoid mutual interference.

bellows grooving allowable deviation and side width

bellows grooving allowable deviation is clearly stipulated in different specifications, usually the bottom of the groove elevation allowable deviation of 20 mm, the bottom of the groove width to meet the above requirements of each side of the net width of not less than 300 mm, and to ensure that the trench straight, the slope on both sides of the design and geological conditions. On the side of the bellows digging how wide, in addition to meeting the net width of 300 mm on each side, if it involves pipeline interface treatment, waterproof measures, etc., also need to increase the width according to the actual process requirements to ensure that the construction operation space is sufficient.

Detailed explanation of trench excavation width of bellowsthe1page

主站蜘蛛池模板: 成人免费一区二区三区| 日韩精品无码去免费专区| 78午夜福利视频| 国产网曝门亚洲综合在线| 亚洲无av码在线中文字幕| 精品热线九九精品视频| 激情小说图片| 人妻熟女一区二区aⅴ水野朝阳| 欧美国产精品久久久乱码| 国产精品久久欧美久久一区| 乌克兰少妇xxxx做受| 大片视频免费观看视频| 日日躁夜夜躁白天躁晚上| 亚洲一区二区三区写真| 九九久久精品国产波多野结衣| 久久男人高潮女人高潮| 中文字幕在线无码一区二区三区| 亚洲国产美女精品久久久久∴| 男女性高爱潮免费网站| 自拍偷在线精品自拍偷无码专区 | 欧美成人精品一区二区综合| 久久se精品一区精品二区| 性欧美大胆免费播放| 亚洲精品国产情侣av在线| 亚洲在av人极品无码网站| 三上悠亚网站在线观看一区二区| 凹凸在线无码免费视频| 亚洲欧洲日产国产av无码| 国产亚洲日韩在线一区二区三区| 青青草无码精品伊人久久蜜臀| 日日橹狠狠爱欧美超碰| 国产亚洲精aa在线观看| 国内精品伊人久久久久av| 欧美大荫蒂毛茸茸视频| 精品亚洲成a人在线观看| 欧美另类图区清纯亚洲| 久久久久久久久免费看无码 | 国产精品毛片一区二区三区| 成年午夜免费韩国做受视频| 玩弄美艳馊子高潮无码| 色窝窝免费播放视频在线|