Construction steps and product specifications of PE plum blossom pipe

2025-03-20

PE seven-hole plum blossom pipe is mainly used in underground communication pipe network system. Next, the construction steps and product specifications of the seven-hole plum blossom pipe will be introduced in detail. 1. Execution standard

YD/T841.5 - 2008 "Plastic Pipe for Underground Communication Pipeline" 2. Construction process (1) Preparation before construction

The buried trench of the pipeline should be kept as straight as possible according to the design requirements and in accordance with the construction operation. If the bottom of the trench is not flat, a layer of fine sand can be laid. Be sure to remove the hard objects in the trench before embedding the pipe to prevent the deformation of the pipeline. When starting to bury the pipe, the porous pipe should be reserved for 1-10CM in the human well for subsequent cable threading. It is strictly forbidden for sediment and foreign objects to be mixed into the pipe during the embedding process. ( 2) Laying construction operation

pipe connection: place the pipe-like positioning rib facing up to clean the outer wall of the end pipe. Insert the direct end socket, pad a thick wooden board on the end face, and hit the wooden board with a hammer to make the pipe socket in place. At the direct other end of the receiving port, insert the other pipe and socket it in place, and then extend it to the next manhole. Length adjustment: In actual construction, the length of each pipe after connection is not necessarily the same as the length between the human wells. At this time, it is necessary to accurately measure the length of the pipe according to the actual length of the manhole, and saw it with a hacksaw to ensure that the saw mouth is flat and neat. After the docking is completed, the end that extends into the manhole should be plugged with a pipe plug to prevent foreign matter from invading. ( 3) Backfill soil operation

After the pipe is laid, it should be backfilled with fine sand or fine soil to the height of the buried pipe. Do not let the pipe be in a suspended state, and then backfill other soil. It is forbidden to smash large stones and large dry clods into the pipe. (4) Backfill soil quality requirements

backfill soil shall not contain stones, mud, broken bricks and other debris greater than 100mm. When filling soil, there must be no water in the trench, no backfill mud or corrosive soil is allowed, and there is no spring phenomenon after filling. After laying a PE plum blossom pipe, be sure to use a pre-piercer or a wire as long as the PE plum blossom pipe to pass through it. When the crossing can be completed, then piercing or laying the next pipeline, to avoid wasting manpower and material resources, resulting in repeated construction. (5) Special section of the treatment

When the pipeline passes through the area of serious damage by external force, the joint part is covered with cement concrete to ensure its absolute safety. (6) The connection operation

HDPE special plum blossom pipe joint, which is thin but has good shrinkage. Generally, there is no sealing problem after installation. If there is a sealing requirement, it can be blown with a hot air gun. Since the plum blossom pipe itself contains filling materials that increase hardness and has small shrinkage, the plum blossom pipe joint shrinks, which usually solves the sealing problem. If the sealing requirements are high, you can apply some PE glue to the end of the plum blossom pipe in the core of the joint in advance, and then blow it with a hot air gun after the joint is put on the butt sleeve. (7) Construction tips

When installing and using the plum blossom pipe for the first time, the first section (that is, the distance between two human wells) can be laid without backfilling. Try to pierce or two holes with a cable piercer, and after smooth penetration, proceed to the next section of laying, which will be more secure. Three, product specifications

product specifications outer diameter branch pipe inner diameter error Remarks seven-hole plum blossom pipe 32mm0.5 disc pipe up to 100 meters five-hole large plum blossom pipe 32mm0.5 disc pipe up to 150 meters five-hole plum blossom pipe 28mm0.5 disc pipe up to 200 meters five-hole small plum blossom pipe 26mm0.5 disc pipe up to 200 meters

Hubei AD Building Materials Co., Ltd. as Hubei seven-hole plum blossom pipe manufacturers, specializing in the production of pe seven-hole plum blossom pipe.

Source: Hubei AD Building Materials Co., Ltd., welcome to share! Hotline: 17399989993

Construction steps and product specifications of PE plum blossom pipethe1page


主站蜘蛛池模板: 欲香欲色天天天综合和网| 老熟女视频| 久久久久琪琪去精品色一到本| 国产欧美精品aaaaaa片| 亚洲欧美日韩综合一区二区| 久久精品国产只有精品96| 亚洲国产成人va在线观看天堂 | 欧美成人亚洲高清在线观看| 尤物国产在线精品一区| 国产美女视频免费观看的网站| 波多野吉衣av无码| 国产偷人妻精品一区二区在线| 久久亚洲精品成人av无码网站 | 国产人妻精品一区二区三区| 国产超碰人人爱被ios解锁| 久久精品国产精品国产精品污| 无码国产精品一区二区免费式影视| 香蕉久久一区二区三区啪啪| 熟女乱色一区二区三区| 8av国产精品爽爽ⅴa在线观看| 人妻护士在线波多野结衣| 午夜福利视频合集| 牛牛在线视频| 亚洲成a人v在线蜜臀| 国产欧美一区二区三区在线看| 亚洲综合久久成人a片| 国产熟睡乱子伦视频| 日韩成人免费视频| 国产精品无码一二区免费| 日韩精品区一区二区三vr| 亚洲精品亚洲人成人网| 激情综合丁香五月| 国产精品成人av片免费看| 美女网站免费福利视频| 亚洲人成无码网站| 688欧美人禽杂交狂配| 粗大的内捧猛烈进出小视频| 免费网站观看www在线观看| 丰满大乳少妇在线观看网站| 国产色欲av一区二区三区| 色偷偷色噜噜狠狠成人免费视频|