Construction steps and product specifications of PE plum blossom pipe

2025-03-20

PE seven-hole plum blossom pipe is mainly used in underground communication pipe network system. Next, the construction steps and product specifications of the seven-hole plum blossom pipe will be introduced in detail. 1. Execution standard

YD/T841.5 - 2008 "Plastic Pipe for Underground Communication Pipeline" 2. Construction process (1) Preparation before construction

The buried trench of the pipeline should be kept as straight as possible according to the design requirements and in accordance with the construction operation. If the bottom of the trench is not flat, a layer of fine sand can be laid. Be sure to remove the hard objects in the trench before embedding the pipe to prevent the deformation of the pipeline. When starting to bury the pipe, the porous pipe should be reserved for 1-10CM in the human well for subsequent cable threading. It is strictly forbidden for sediment and foreign objects to be mixed into the pipe during the embedding process. ( 2) Laying construction operation

pipe connection: place the pipe-like positioning rib facing up to clean the outer wall of the end pipe. Insert the direct end socket, pad a thick wooden board on the end face, and hit the wooden board with a hammer to make the pipe socket in place. At the direct other end of the receiving port, insert the other pipe and socket it in place, and then extend it to the next manhole. Length adjustment: In actual construction, the length of each pipe after connection is not necessarily the same as the length between the human wells. At this time, it is necessary to accurately measure the length of the pipe according to the actual length of the manhole, and saw it with a hacksaw to ensure that the saw mouth is flat and neat. After the docking is completed, the end that extends into the manhole should be plugged with a pipe plug to prevent foreign matter from invading. ( 3) Backfill soil operation

After the pipe is laid, it should be backfilled with fine sand or fine soil to the height of the buried pipe. Do not let the pipe be in a suspended state, and then backfill other soil. It is forbidden to smash large stones and large dry clods into the pipe. (4) Backfill soil quality requirements

backfill soil shall not contain stones, mud, broken bricks and other debris greater than 100mm. When filling soil, there must be no water in the trench, no backfill mud or corrosive soil is allowed, and there is no spring phenomenon after filling. After laying a PE plum blossom pipe, be sure to use a pre-piercer or a wire as long as the PE plum blossom pipe to pass through it. When the crossing can be completed, then piercing or laying the next pipeline, to avoid wasting manpower and material resources, resulting in repeated construction. (5) Special section of the treatment

When the pipeline passes through the area of serious damage by external force, the joint part is covered with cement concrete to ensure its absolute safety. (6) The connection operation

HDPE special plum blossom pipe joint, which is thin but has good shrinkage. Generally, there is no sealing problem after installation. If there is a sealing requirement, it can be blown with a hot air gun. Since the plum blossom pipe itself contains filling materials that increase hardness and has small shrinkage, the plum blossom pipe joint shrinks, which usually solves the sealing problem. If the sealing requirements are high, you can apply some PE glue to the end of the plum blossom pipe in the core of the joint in advance, and then blow it with a hot air gun after the joint is put on the butt sleeve. (7) Construction tips

When installing and using the plum blossom pipe for the first time, the first section (that is, the distance between two human wells) can be laid without backfilling. Try to pierce or two holes with a cable piercer, and after smooth penetration, proceed to the next section of laying, which will be more secure. Three, product specifications

product specifications outer diameter branch pipe inner diameter error Remarks seven-hole plum blossom pipe < 108mm > 32mm0.5 disc pipe up to 100 meters five-hole large plum blossom pipe < 93mm > 32mm0.5 disc pipe up to 150 meters five-hole plum blossom pipe < 82mm > 28mm0.5 disc pipe up to 200 meters five-hole small plum blossom pipe < 76mm > 26mm0.5 disc pipe up to 200 meters

Hubei AD Building Materials Co., Ltd. as Hubei seven-hole plum blossom pipe manufacturers, specializing in the production of pe seven-hole plum blossom pipe.

Source: Hubei AD Building Materials Co., Ltd., welcome to share! Hotline: 17399989993

Construction steps and product specifications of PE plum blossom pipe第1張


主站蜘蛛池模板: 久久综合九色综合97欧美| 狼人大香伊蕉在人线国产| 久久精品人人做人人综合| 精品国产乱码久久久久app下载| 亚洲国产欧美不卡在线观看| 亚洲精品国产精品乱码不99| 亚洲色爱图小说专区| 色婷婷美国农夫综合激情亚洲| av无码不卡一区二区三区| 亚洲国产av无码精品色午夜| 亚洲性夜夜天天天| 亚洲午夜无码久久yy6080| а√天堂资源8在线官网在线| 少妇人妻精品一区二区| 亚洲色欲色欲www在线播放| 日本熟妇大乳| 老司机午夜精品视频资源| 亚洲国产成人超a在线播放| 久久亚洲精品无码观看网站| 久久99精品久久久久久hb亚瑟| 另类亚洲综合区图片区小说| 国自产拍偷拍精品啪啪| 精品国产亚洲午夜精品av| 亚洲国产2021精品无码| 欧美亚洲综合久久偷偷人人| 麻豆高清免费国产一区| 无码熟熟妇丰满人妻porn| 亚洲精品一区二区三区不卡| 成年无码动漫av片在线尤物| 亚洲性色av性色在线观看| 成码无人av片在线电影网站| 欧美激情一区二区三区在线| 色婷婷婷丁香亚洲综合| 无套内射在线观看theporn| 日本丰满熟妇videossex8k| 久久久无码精品午夜| 天天爽夜夜爽人人爽从早干到睌| 国产免费久久精品99re丫丫| 精品无码成人久久久久久| 在厨房被c到高潮a毛片奶水| 久久精品夜夜夜夜夜久久|