Brief Introduction, Construction Steps and Physical Properties of MPP Power Pipe

2025-03-21

First, construction instructions

1, MPP power pipe transportation, construction process is strictly prohibited arbitrary throwing, impact, marking, exposure.

2, MPP power pipe hot melt butt two tube axis should be aligned, the end face cutting to be vertical flat.

3, Wuhan MPP power pipe processing temperature, time, pressure, depending on the climate conditions to adjust accordingly.

4, MPP power pipe pipe minimum bending radius should be 75% of the outer diameter of the pipe.

5, Hubei MPP power casing standard fixed length (6 meters, 9 meters) pipe configuration pillow 3 pay, pipe pillow spacing of 2.0m, pipe pillow from the joint is 0.5m.

2. Construction method

(1) The preparatory work stage before construction, that is, organize technicians to re-test the plane control points and leveling points delivered by the owner, set temporary leveling points at a distance of about 150 meters, and close them with the elevation reference point. The closure difference is less than the specification requirements. The elevation control baseplate elevation is measured by BJD23 automatic leveling level. The construction control network and the starting point of the construction level should be set in a place that is not disturbed, firm and reliable, and has good visibility conditions, which is easy to control. On the premise of matching the elevation of the sidewalk with the elevation, the project and the main road should also be considered.

(2) The trench construction is based on the local obedience to the whole, creating conditions for the overall appearance.

1, trench earth excavation

① The trench construction adopts trapezoidal fracture, section excavation, mainly mechanical, manual cooperation. Adopt straight groove form of excavation. Strictly control the design elevation of the bottom of the trench during excavation, and the mechanical excavation should keep 10cm with manual bottom cleaning to avoid mechanical overexcavation disturbing the original soil at the bottom of the trench. If you encounter bad soil, report it in writing to the owner and the supervision engineer, and then make construction treatment after approval.

② Do a good job of foundation pit drainage during excavation, and the maximum area of 15cm 15cm symmetrical on both sides of the drainage ditch is appropriate. Before and during construction, the exclusion of surface water and the recruitment and drainage of water accumulation in the base are tested to ensure that the base plate of the condenser is constructed in a waterless environment. During the excavation of the foundation pit, no abandoned soil and building materials are piled up near Jihang, so as to achieve civilized construction. When excavating the foundation pit, if bad soil is encountered, the slope should be appropriately increased to ensure the working surface at the bottom of the groove.

2. Before the construction of the trench concrete baseplate, level the trench baseplate, release the trench center line, and use the trench soil mold to pour the concrete baseplate according to the designed height and width. The concrete is labeled C15, and the commercial concrete is used with a thickness of 10cm. When pouring, vibrate strictly according to the requirements until it is completely dense. After pouring, light collection and timely maintenance are carried out to ensure the strength of the concrete. The trench baseplate should be 3% sloped in the direction of drainage, so as to drain the cable trench.

3, the laying of the cable pipe is tiled on the concrete baseplate with a 10cm thick medium sand cushion, and then laying the cable pipe, and filling the gap between the pipes with sand, tamping with wooden sticks, so that the sand forms an arc-shaped pipe bed on the outer wall of the pipe. When laying the pipe, the joints of each section should be staggered to ensure that the connection is tight and no sand can penetrate. After the pipe group is laid, an 8 #iron wire is penetrated into each hole for future threading. According to the construction requirements, lay the pipe layer by layer, and wait for the top. After the layer of pipe is laid, lay a 10cm thick medium sand cushion.

4, the earth backfill step settles, so that the sand and the cable pipe form a dense whole. After the telephone row has been laid, the earth return is carried out, mainly mechanical and manual cooperation. Layered backfill, the thickness of each layer is 15cm, the well is tamped, and the height of the backfill matches the elevation of the main road surface. The remaining soil is transported to the residual soil disposal site by dump truck.

3. Physical properties

Technical performance items Technical performance indicators Test method Density 0.90~ 0.94GB/T1033.1 Ring stiffness (3% room temperature) SN24 grade ? 24GB/T9647-2015SN32 grade ? 32SN40 grade ? 40 Flattening test When the vertical deformation of the pattern is 50% of the original inner diameter, the

style should not crack or crack

DL/T802.7-2010 Drop hammer impact pattern should not crack or crack DL/T802.7-2010 Vicat softening temperature ? 150 ℃ GB/T-1633-2000 Tensile strength Pipe: ? 25;

Welded joint: ? 22.5

GB/T8804.3-2003 Elongation at break ? 400% GB/T8804.3-2003 Bending strength ? 36MPaGB/T9341-2000MPP power pipe is a customized product, Wuhan MPP power pipe, Hubei MPP power pipe manufacturer is Hubei Yuyuan Building We have a number of high-speed production lines, which are faster than the production speed of ordinary manufacturers. Generally, contact us to customize MPP pipelines, which can be delivered within one to three days, which can effectively ensure the construction progress.

Source: Hubei AD Building Materials Co., Ltd., welcome to share! Hotline: 17399989993

Brief Introduction, Construction Steps and Physical Properties of MPP Power Pipethe1page


主站蜘蛛池模板: 人与禽性视频77777| 亚洲日本韩国| 国产成人精品免费午夜app| 国产开嫩苞视频在线观看| 国产又色又爽又高潮免费| 亚洲精品拍拍央视网出文| 国产美女亚洲精品久久久久| 国产粉嫩小泬在线观看泬| 猫咪免费人成网站在线观看| 亚洲国内自拍愉拍| 久久久无码中文字幕久...| 无码精品人妻一区二区三区老牛| 精品成人免费国产片| 中文在线а天堂中文在线新版| 亚洲gv天堂gv无码男同| 在线观看无码av网站永久免费| 国产吃奶在线观看| 日本中文字幕在线| 亚洲男男无套gv大学生| 欧美成人a在线网站| 免费观看又色又爽又黄的韩国 | 国产对白叫床清晰在线播放| 亚洲区少妇熟女专区| 国产农村乱对白刺激视频| 精品国产高清自在线一区二区| 国产福利免费视频不卡| 少妇人妻综合久久中文字幕| 夜夜天天噜狠狠爱2019| 亚洲爆乳成av人在线视菜奈实| 精品国产成人网站一区在线| 国产亚洲日韩一区二区三区| 国产午夜福利短视频| 国产v亚洲v欧美v精品综合| 日韩精品人妻系列无码专区免费| 无码视频免费一区二区三区| 精品毛片乱码1区2区3区| 国产精品精华液网站| 九九99无码精品视频在线观看| 精产国品一区二区三产区| 影音先锋人妻每日资源站| 精品视频一区二区三区中文字幕 |