PVC drainage pipe construction scheme: different construction processes of home improvement and engineering

2025-08-19

With the advantages of corrosion resistance, easy installation and low cost, PVC drainage pipes have become the core materials for home improvement hydropower renovation and municipal engineering drainage systems. But many people do not know that the construction process of PVC drainage pipes in home improvement and engineering scenarios is obviously different due to space restrictions, functional requirements and specifications. Home improvement focuses more on "personalized adaptation", and engineering emphasizes "large-scale compliance". Only by clarifying the process logic of the two can we avoid construction misunderstandings.

Whether it is home improvement or engineering, the basic preparation before construction cannot be ignored: the first is the material inspection - check the specifications, wall thickness, and certificate of PVC pipe to ensure that there are no cracks or deformations; the second is the planning and design - according to the drainage needs (such as the bathroom squatting, hand sanitizer, the rain water pipe network of the project, and the fire drainage) to determine the direction of the pipeline, avoiding the load-bearing structure and wire pipeline.

Home improvement scenes are mostly residences and apartments. Space is limited and the owner has high requirements for aesthetics and practicality. The process emphasizes "customization": first, positioning and grooving, according to the apartment plan and the owner's needs (such as washing machine space reservation, bathroom cabinet drainage), mark the direction of the pipeline with ink lines. The depth of grooving should cover the outer diameter of the pipeline + 2cm, and it is strictly forbidden to damage the steel bars of the load-bearing wall or shear wall; then, pipe laying, following the principle of "downhill drainage" (slope 5), connecting pipes and pipe fittings with PVC special adhesive (cleaning the interface oil stains before bonding), and reserving an inspection port about 1.2m away from the ground at the end of the branch pipes in the kitchen and bathroom; then fixing and protecting, fixing the pipeline every 80-100cm with plastic pipe cards (encryption at turns) ), the bare riser needs to be wrapped in sound insulation cotton and then managed; finally, the water test is accepted, and the closed water test is done - plug the drain and inject water until it is full of water, and check whether the downstairs is leaking after 24 hours. After passing, the follow-up tiling can be carried out.

Engineering scenarios (such as office buildings, residential areas, and municipal roads) have larger displacement, longer pipelines, and more emphasis on "standardization" and "risk resistance" in the process: The first step is to deepen the design, combine the building construction map with the "Building Water Supply and Drainage Design Standards", calculate the pipe network displacement (such as the rain water pipe in the residential area needs to meet the 50-year rainfall standard), optimize the pipeline direction to avoid crossing with other pipelines, and issue a detailed node diagram; the second step is bracket installation, select the metal bracket according to the pipe diameter (such as DN100 pipe with 505 angle steel), the bracket spacing is strictly in accordance with the specifications (horizontal pipe 1.5m, riser 2m), and fixed to the structural wall with expansion bolts; the third step is pipeline hoisting, large-diameter pipelines (DN300 and above) are hoisted by cranes, and soft sling protects the pipeline The interface is sealed with a rubber ring; the fourth step is the system pressure test, sectional pressure test - the riser pressure is 0.3 MPa for 10 minutes without pressure drop, the horizontal pipe is 0.2 MPa, and the medium is clean water; finally, the hidden acceptance is invited to the construction, supervision, and design units to check together, and the backfill can only be done after signing the acceptance record.

The core differences between home improvement and engineering are reflected in four aspects: in design, home improvement takes into account the owner's habits (such as low drainage outlets for pregnant women), and the project is based on specifications; in construction scale, home improvement is a small team of 1-2 people. The construction period is 3-5 days, and the project is a team of dozens of people. The team is dispatched quarterly; in terms of process details, home improvement pays attention to sound insulation (including sound insulation cotton), and engineering pays attention to structural safety (bracket anti-corrosion); in acceptance standards, home improvement is mainly based on the owner's satisfaction, and the project needs a third party to detect the report.

Whether it is home improvement or engineering, the core of PVC drain pipe construction is "safe and durable" - home improvement should balance function and beauty in a small space, and the project should ensure compliance and stability in a large system. Mastering the process differences between the two can make the drainage system really "work for decades".


PVC drainage pipe construction scheme: different construction processes of home improvement and engineeringthe1page

主站蜘蛛池模板: 骚片av蜜桃精品一区| 男女啪啪激烈高潮喷出gif免费| 国产精品久久这里只有精品| 无码高潮少妇毛多水多水| 国内精品伊人久久久影视| 97久久国产成人免费网站| 欧美大胆丰满熟妇xxbb| 老太脱裤让老头玩ⅹxxxx| 亚洲gv天堂无码男同在线观看| 大肉大捧一进一出好爽视色大师| 人人妻人人澡人人爽秒播 | 成人伊人青草久久综合网| 人妻 丝袜美腿 中文字幕| 人妻无码不卡中文字幕在线视频 | 国产在沙发上午睡被强| 免费无码不卡中文字幕在线| 真实?交| 无码人妻aⅴ一区二区三区| 亚洲蜜桃v妇女| 毛葺葺老太做受视频| 无码av免费一区二区三区四区 | 成 人片 黄 色 大 片| 国产亚洲精品久久久久久牛牛| 2022国产成人精品视频人| 亚洲 卡通 欧美 制服 中文| 成年女人粗暴毛片免费观看| 99久久国产露脸国语对白| 国产探花在线精品一区二区| 亚洲精品无码久久久久app| 欧美色欧美亚洲国产熟妇| 国产人妻精品区一区二区三区 | 国产精品偷啪在线观看| 性色av无码中文av有码vr| 人妻系列无码专区无码专区| 四虎国产精品成人影院| 免费两性的视频网站| 中文韩国午夜理伦三级好看| 国产裸体美女视频全黄| 国产性色αv视频免费| 亚洲老妈激情一区二区三区| 国产在视频线在精品视频2020|