色婷婷五月综合亚洲小说-国产精品久aaaaa片-在线亚洲97se亚洲综合在线-欧美三级午夜理伦三级-亚洲超清无码制服丝袜无广告

Construction Process of Pre-buried and Reserved PVC Drainage Pipeline in AD (1)

2025-03-21

AD PVC drainage pipe construction guide, 1. Construction preparation (1) Requirements for ordinary steel pipes for reserved holes 1. Material and appearance: The reserved holes are made of ordinary steel pipes, and the surface of the steel pipes should be free from significant rust, depression and distortion defects. When the thickness of the pipe wall is δ 3.5mm, the depth of the scar on the surface of the steel pipe shall not exceed 0.5mm. When the thickness of the pipe wall is δ 3.5mm, the depth of the scar shall not exceed 1mm. (2) Pre-embedded water-stop pipe fittings Acceptance 1. Specification matching: According to the design drawings, purchase the water-stop pipe fittings of the corresponding specifications. 2. Special customization: If the design thickness of the floor slab is greater than [X] mm (or the thickness of the filling layer is greater than [X] mm, it needs to be pre-buried in place at one time), and it needs to be customized to the manufacturer separately. 3. Dimension inspection: When the pipe fittings enter the field, use a vernier caliper to measure the wall thickness and specifications of the pipe fittings to ensure that they are consistent with the specifications of the installed pipeline materials. After passing, they can be accepted and put into storage. (3) Quality requirements for the reserved hole sealing template 1. Template material: The reserved hole template is used to seal the top cover of the reserved hole mold. Waste film-coated plates can be selected, but there must be no defects such as holes, glue opening and serious deformation. 2. Template thickness: The thickness of the template should not be less than 10mm. 2. Construction process and operation points (1) Construction process Pre-embedded water-stop joint pipe fittings inspection Pre-embedded water-stop joint pipe fittings seal the pipe mouth Civil formwork inspection Transfer drainage pipe installation Positioning scribing drainage pipe fittings Fixed quality inspection Acceptance (rectification) Concrete pouring (inspection and protection) Drainage pipe installation (2) Operation points 1. Shaped water-stop joint purchase and inspection, according to the design drawings, purchase the water-stop joint of the corresponding specification. When the floor design thickness is greater than [X] mm (or the thickness of the filling layer is greater than [X] mm, it needs to be pre-buried in place at one time), contact the manufacturer for customization. After the water-stop joint enters the site, use a vernier caliper to measure the wall thickness and specifications of the pipe fittings. After confirming that it is consistent with the specifications of the installed pipeline materials, go through the warehousing procedures. 2. Pre-embedded water-stop joint pipe top pipe sealing: After acceptance of qualified water-stop joint, seal its top with tape, note that the tape must not be pasted to the contact part between the pipe and the concrete. After inspection, store it in the warehouse for backup. 3. Civil formwork inspection and handover: After the civil formwork is installed, the installation technician cooperates with the civil technician to accept the formwork. The inspection content includes whether the elevation and size deviation meet the requirements, and whether there are any legacy problems affecting the subsequent installation and construction. After the indicators are tested qualified, the next process can be carried out. 4. Drainage pipe installation positioning and scribing: After the template acceptance is passed, use a steel ruler to accurately measure the positioning size of the drainage pipe according to the template size, and mark the pre-embedded position of the pipe on the template with paint or scribing pen. For rows of pipes, it is necessary to draw points with elastic lines. 5. Drainage pipe fittings fixing: According to the drawn positioning points and lines, place the water stop joint to the corresponding point, use iron nails to pass through the reserved holes on the water stop joint, and fix the water stop joint on the template. After checking that it is firmly fixed and not loose, hand over to the next process for construction. 6. Quality inspection and acceptance (rectification): After the civil beam and plate steel reinforcement binding is completed, self-check the position size and fixing of the water stop joint again. If any problems are found, rectify them in time. After passing the self-inspection, report it to the supervision unit for acceptance. Only after passing the acceptance can the next process be carried out. 7. Concrete pouring (inspection and protection): When pouring beam and slab concrete for civil construction, arrange a special person to be responsible for the protection and inspection of the finished product of the pre-embedded water stop joint. Once the deformation is found, restore it immediately; if the seal is damaged, clean it up in time to prevent the concrete from being difficult to clean after solidification. 8. Drainage pipe installation: Before the installation of the drainage pipe, insert test (the gap of [specific gap value] mm is reserved for pipes and fittings as required) and mark it well. The sawed pipe mouth should be kept straight and free of burrs. Use the brush to evenly apply the glue (first apply the socket, the thickness is controlled at [specific thickness value] mm, then apply the nozzle, apply evenly, no omission), then align the nozzle with the socket, slowly insert it into the mark (rotation angle is not more than 1/3 turn), wipe the extruded residual glue in time.

Construction Process of Pre-buried and Reserved PVC Drainage Pipeline in AD (1)the1page

主站蜘蛛池模板: 精品国产情侣高潮露脸在线| 成人精品一区日本无码网| 人人妻人人澡人人爽国产一区| 无码人妻精品一区二区蜜桃色欲| 中文字幕免费视频| 亚洲精品国产精品无码国模| 精品人妻大屁股白浆无码| 亚洲熟妇少妇任你躁在线观看| 国产亚洲精品久久久一区| 一区二区三区在线 | 中国| 99久久综合狠狠综合久久止| 国产交换配偶在线视频| 狠狠爱五月丁香亚洲综合| 射精专区一区二区朝鲜| 久久久久人妻精品一区| 亚洲人成网站日本片| 亚洲成a人片在线观看无码不卡| 国产精品麻豆成人av电影| 四虎精品 在线 成人 影院| 四虎网站| 亚洲香蕉中文日韩v日本| 国产天堂亚洲国产碰碰| 欧美国产日韩久久mv| 日本三级片网站| 99久久精品精品6精品精品| 久久这里只有热精品18| 免费无码国产欧美久久18| 亚洲精品岛国片在线观看| 日韩亚洲产在线观看| 精品久久久99大香线蕉| 国产午夜精品久久精品电影| 国产精品igao视频网网址| 亚洲第一网站男人都懂| 国产熟妇疯狂4p交在线播放| 亚洲国产av无码精品色午夜| 美女毛片一区二区三区四区| 欧美丰满熟妇xxxx性ppx人交| 色婷婷亚洲婷婷八月中文字幕| 国产99视频精品免费视看9| 国产片免费福利片永久| 亚洲国产av最新地址|