Construction Method and Product Performance of CPVC Power Pipe

2025-03-20

CPVC power pipe introduction 1. Construction method (1) CPVC power pipe pipe laying installation CPVC power casing standard length is 6 meters, each pipe needs to be equipped with 3 pipe pillows, pipe pillow spacing is set to 2.0m, pipe pillow from the joint distance is 0.5m. CPVC power sheath tube under the tube operation can be done manually, ground personnel will transfer the pipe to the bottom of the groove construction personnel, it is strictly forbidden to roll the pipe from the edge of the groove into the groove. If you need to adjust the length of CPVC power sheath tube, you can use mechanical tools to cut. The cutting incision should be perpendicular to the axis of the pipe pillow, and the incision should be smooth and flat. (2) CPVC power sheath tube connection CPVC power sheath tube connection method using socket or interface connection. The surface of the CPVC power jacket is marked with a mark of the insertion length. After the pipe is inserted into the socket, it is necessary to confirm whether the insertion mark is accurate and in place. Before the connection of the CPVC power jacket, the soil or other attachments on the outside of the pipe socket and the inside of the rubber ring should be removed to facilitate the connection and prevent water leakage. (3) Backfill soil Trench compounding should be carried out in time after the acceptance of the pipeline concealed engineering to avoid losses caused by long-term exposure of the pipeline. The compactness of the backfill around the CPVC power jacket must meet the design requirements. The backfill should be filled into the groove manually, and mechanical backfill is strictly prohibited. The quality of the backfill must meet the compactness requirements specified in the design. 2. Product performance Item technical indicators Density (kg/m 3) 1350 - 1550 Volume resistivity Ω · cm High pressure protective tube ? 93; ordinary protective tube ? 83 Vicat softening temperature ? 1.010 3 3 Drop hammer impact (232) ℃ 9/10 No rupture Flat test No rupture Ring stiffness (KN/m 2) ? 8 Longitudinal retraction rate (%) ≤ 4 Ring thermal compression force Wall thickness (KN) ≤ 7.00 and ? 0.70 Corrosion resistance Appearance No change Oxygen index (%) ? 38 III. Physical properties Pipe physical and mechanical properties Item requirements Test method Vicat softening temperature ? 93 ℃ GB/T8802 - 2001 Ring thermal insulation Compression force (nominal wall thickness en 5.0 - 8.0) 0.45KnGB /T9647 - 2003 Ring heat-breaking compression force (nominal wall thickness en ? 8.0) 1.26KnGB/T9647 - 2003 Volume resistivity ? 1.010 ? ? GB/T1410 - 1989 Drop hammer impact test 9/10 By GB/T14152 - 2001 Longitudinal retraction rate ≤ 5% GB/T6671 - 2001 Source: Hubei AD Building Materials Co., Ltd., welcome to share! Hotline: 17399989993 This paper introduces the construction method and product performance of CPVC power pipe. Hubei AD Building Materials Co., Ltd. sells products as Wuhan CPVC power pipe manufacturer and Hubei CPVC power cable protection sleeve manufacturer.

Construction Method and Product Performance of CPVC Power Pipethe1page



主站蜘蛛池模板: 国产亚洲精品久久久999| 亚洲日韩一区二区三区| 日韩 另类 综合 自拍 亚洲| 国产精品久久国产精品99 gif| 久章草在线无码视频观看| 精品日本一区二区三区免费| 无码喷潮a片无码高潮| 亚洲精品无码永久中文字幕| 国产av一区二区三区传媒| 国产 精品 丝袜| 国内少妇偷人精品视频| 国产超碰人人做人人爱ⅴa| 无码专区—va亚洲v天堂麻豆| 在线看片免费人成视频久网下载| 97色成人综合网站| 伴郎粗大的内捧猛烈进出视频观看| 久久精品囯产精品亚洲| 成人网站亚洲综合久久| 苍井空浴缸大战猛男120分钟| 国产碰在79香蕉人人澡人人看喊| 国产精品亚洲а∨天堂网不卡| 国产免费无码av在线观看| 成年女人黄小视频| 日韩视频中文字幕精品偷拍| 国产成人无码精品xxxx| 亚洲高请码在线精品av| 久久综合伊人中文字幕| 国产男女猛烈无遮挡免费网站| 国产一卡2卡3卡四卡精品app| 无码激情亚洲一区| 亚欧乱色国产精品免费九库| 亚洲字幕av一区二区三区四区| 国产精品白浆在线观看免费| 亚洲国产精品隔壁老王| 国产三级a在线观看| 在线精品无码字幕无码av| 精品久久久久久人妻无码中文字幕| 亚洲巨乳自拍在线视频| 无码h肉在线观看免费一区| 中文字幕欧美日韩va免费视频| 久久久精品国产一二三产区区别|