Double wall corrugated pipe construction manual

2025-03-19

Construction points of double-wall corrugated pipe

1. Excavation of trenches.

The net width of the bottom of the trench is generally determined according to the diameter of the pipe. When the diameter is greater than 450mm, the net width of each side of the pipe should not be less than 500mm. When the diameter is less than 450mm, the net width of each side should not be less than 300mm. In order to avoid the bottom of the groove being soaked in water, drainage measures must be taken before opening. If manual drainage is used, it can be excavated when the water level drops below the bottom of the groove.

Second, laying a cushion. Double-wall corrugated pipe construction contact, Hubei double-wall corrugated pipe

before the installation of the pipeline, the need to lay a cushion, the thickness should also meet the design requirements, for better soil foundation, the bottom of the groove laying a layer of medium coarse sand cushion can be, the thickness is generally 10mm; for poor soil foundation, you can use layered laying, the upper layer using medium coarse sand, the thickness should be greater than 50mm, the lower layer using a thickness of 100mm-150mm crushed stone.

III. Installation and connection. Double-wall corrugated pipe construction contact Hubei double-wall corrugated pipe manufacturer, Hubei AD Building Materials Co., Ltd.

HDPE double-wall corrugated pipe should be strictly inspected before laying the lower pipe. Pipes that do not meet the standards should be strictly prohibited from running down the pipe. The nozzles at the end of the pipe are divided into sockets and sockets. The sockets should be installed in the direction of water flow, and the sockets should be installed in the direction of countercurrent flow. When interfacing, first clean up the inner wall of the nozzle, and then apply silicone oil and other lubricants on the socket and socket rubber ring, and finally keep the central axis of the nozzle aligned. Double-wall corrugated pipe, wuhan pe double-wall corrugated pipe manufacturer.

Fourth, masonry inspection well

The bottom foundation of the well should be poured at the same time as the bottom foundation of the pipe; generally, the circular inspection well adopts the method of wall masonry, small inner seam and large outer seam to plug broken bricks into the outer ash seam to reduce the amount of mortar. The vertical ash joints of the upper and lower skin of each layer of bricks should be staggered; finally, the connection between the pipeline and the inspection well should be based on a flexible foundation, which is also different from traditional pipelines.

Five, closed water test

Double wall corrugated pipe construction manualthe1page

Double wall corrugated pipe construction manualthe2page

double-wall corrugated pipe construction contact, Hubei AD Building Materials Co., Ltd. is at your service, AD brand double-wall corrugated pipe, Jingjie double-wall corrugated pipe, Wuhan corrugated pipe, Hubei double-wall corrugated pipe manufacturer


主站蜘蛛池模板: 国产最新精品自产在线观看| 国产无套白浆视频在线观看 | 国外av无码精品国产精品| 免费人成在线观看网站品爱网| 亚洲熟妇自拍无码区| 欧产日产国产精品精品| 无码一区二区| 男人的天堂亚洲一线av在线观看| 国产大片内射1区2区| 国产成人一卡2卡3卡四卡视频| 人妻中文字系列无码专区 | 国产久久精品| 久久久久久久综合日本| 青青草国产精品免费观看| 日韩放荡少妇无码视频| 久久综合色一综合色88欧美| 亚洲成a人片77777群色| 日本丰满熟妇bbxbbxhd| 精品少妇人妻av一区二区三区| 99久久久精品免费观看国产| 精品人妻无码| 美女扒开尿口让男人桶| 一本加勒比hezyo中文无码| 激情文学另类小说亚洲图片| 亚洲欧美中文日韩v日本| 欧美精品亚洲精品日韩专区| а√天堂资源官网在线资源| 亚洲色大成网站www久久九九| 国产精品自产拍高潮在线观看| 日本亚洲欧美高清专区vr专区| 人人鲁免费播放视频| 国产亚洲精品线视频在线| 国产欧美日韩亚洲一区二区三区| 少妇无码吹潮| 97碰碰碰人妻视频无码| 久久日本三级韩国三级| 少妇人妻丰满做爰xxx| 无套内谢的新婚少妇国语播放| 看曰本女人大战黑人视频| 性久久久久久| 色综合色狠狠天天综合色|