Double wall corrugated pipe construction manual

2025-03-19

Construction points of double-wall corrugated pipe

1. Excavation of trenches.

The net width of the bottom of the trench is generally determined according to the diameter of the pipe. When the diameter is greater than 450mm, the net width of each side of the pipe should not be less than 500mm. When the diameter is less than 450mm, the net width of each side should not be less than 300mm. In order to avoid the bottom of the groove being soaked in water, drainage measures must be taken before opening. If manual drainage is used, it can be excavated when the water level drops below the bottom of the groove.

Second, laying a cushion. Double-wall corrugated pipe construction contact, Hubei double-wall corrugated pipe

before the installation of the pipeline, the need to lay a cushion, the thickness should also meet the design requirements, for better soil foundation, the bottom of the groove laying a layer of medium coarse sand cushion can be, the thickness is generally 10mm; for poor soil foundation, you can use layered laying, the upper layer using medium coarse sand, the thickness should be greater than 50mm, the lower layer using a thickness of 100mm-150mm crushed stone.

III. Installation and connection. Double-wall corrugated pipe construction contact Hubei double-wall corrugated pipe manufacturer, Hubei AD Building Materials Co., Ltd.

HDPE double-wall corrugated pipe should be strictly inspected before laying the lower pipe. Pipes that do not meet the standards should be strictly prohibited from running down the pipe. The nozzles at the end of the pipe are divided into sockets and sockets. The sockets should be installed in the direction of water flow, and the sockets should be installed in the direction of countercurrent flow. When interfacing, first clean up the inner wall of the nozzle, and then apply silicone oil and other lubricants on the socket and socket rubber ring, and finally keep the central axis of the nozzle aligned. Double-wall corrugated pipe, wuhan pe double-wall corrugated pipe manufacturer.

Fourth, masonry inspection well

The bottom foundation of the well should be poured at the same time as the bottom foundation of the pipe; generally, the circular inspection well adopts the method of wall masonry, small inner seam and large outer seam to plug broken bricks into the outer ash seam to reduce the amount of mortar. The vertical ash joints of the upper and lower skin of each layer of bricks should be staggered; finally, the connection between the pipeline and the inspection well should be based on a flexible foundation, which is also different from traditional pipelines.

Five, closed water test

Double wall corrugated pipe construction manual第1張

Double wall corrugated pipe construction manual第2張

double-wall corrugated pipe construction contact, Hubei AD Building Materials Co., Ltd. is at your service, AD brand double-wall corrugated pipe, Jingjie double-wall corrugated pipe, Wuhan corrugated pipe, Hubei double-wall corrugated pipe manufacturer


主站蜘蛛池模板: 热re99久久精品国产99热| 国产女人与公拘交在线播放| 99久久人妻精品免费二区| ,亚洲AV午夜精品无码专区| 精品国产自在精品国产精华天| 99久久综合狠狠综合久久止| 亚洲日韩小电影在线观看| 亚洲色欲综合一区二区三区| 996热re视频精品视频这里| 欧美顶级metart裸体全部自慰| 国产精品免费无码二区| 国产精品线路一线路二| a男人的天堂久久a毛片| 国产欧美一区二区精品久久久| 无码精品黑人一区二区三区| 国产偷人激情视频在线观看| 宅男666在线永久免费观看| 亚洲综合精品第一页| 熟妇人妻不卡无码一区| 亚洲精品久久区二区三区蜜桃臀| 国产内射性高湖| 欧美性群另类交| 国产精品无码专区久久久| 性欧美老人牲交xxxxx视频| 久久天天躁夜夜躁一区| 2021国产精品国产精华| 久久精品国产99久久六动漫| 欧美人与动人物牲交免费观看久久 | 天天躁日日躁狠狠躁欧美老妇 | 国产久免费热视频在线观看| 久久亚洲精品中文字幕无码| 大肉大捧一进一出好爽动态图| 少妇做爰免费视看片| 亚洲国产成人精品激情姿源| 亚洲国产精华液网站w| 国产精品美女久久久久av爽| 午夜三级a三级三点| 国产乱码人妻一区二区三区| 一本热久久sm色国产| 久久www色情成人免费观看| 国产香蕉尹人在线视频你懂的 |