Double wall corrugated pipe construction manual

2025-03-19

Construction points of double-wall corrugated pipe

1. Excavation of trenches.

The net width of the bottom of the trench is generally determined according to the diameter of the pipe. When the diameter is greater than 450mm, the net width of each side of the pipe should not be less than 500mm. When the diameter is less than 450mm, the net width of each side should not be less than 300mm. In order to avoid the bottom of the groove being soaked in water, drainage measures must be taken before opening. If manual drainage is used, it can be excavated when the water level drops below the bottom of the groove.

Second, laying a cushion. Double-wall corrugated pipe construction contact, Hubei double-wall corrugated pipe

before the installation of the pipeline, the need to lay a cushion, the thickness should also meet the design requirements, for better soil foundation, the bottom of the groove laying a layer of medium coarse sand cushion can be, the thickness is generally 10mm; for poor soil foundation, you can use layered laying, the upper layer using medium coarse sand, the thickness should be greater than 50mm, the lower layer using a thickness of 100mm-150mm crushed stone.

III. Installation and connection. Double-wall corrugated pipe construction contact Hubei double-wall corrugated pipe manufacturer, Hubei AD Building Materials Co., Ltd.

HDPE double-wall corrugated pipe should be strictly inspected before laying the lower pipe. Pipes that do not meet the standards should be strictly prohibited from running down the pipe. The nozzles at the end of the pipe are divided into sockets and sockets. The sockets should be installed in the direction of water flow, and the sockets should be installed in the direction of countercurrent flow. When interfacing, first clean up the inner wall of the nozzle, and then apply silicone oil and other lubricants on the socket and socket rubber ring, and finally keep the central axis of the nozzle aligned. Double-wall corrugated pipe, wuhan pe double-wall corrugated pipe manufacturer.

Fourth, masonry inspection well

The bottom foundation of the well should be poured at the same time as the bottom foundation of the pipe; generally, the circular inspection well adopts the method of wall masonry, small inner seam and large outer seam to plug broken bricks into the outer ash seam to reduce the amount of mortar. The vertical ash joints of the upper and lower skin of each layer of bricks should be staggered; finally, the connection between the pipeline and the inspection well should be based on a flexible foundation, which is also different from traditional pipelines.

Five, closed water test

Double wall corrugated pipe construction manualthe1page

Double wall corrugated pipe construction manualthe2page

double-wall corrugated pipe construction contact, Hubei AD Building Materials Co., Ltd. is at your service, AD brand double-wall corrugated pipe, Jingjie double-wall corrugated pipe, Wuhan corrugated pipe, Hubei double-wall corrugated pipe manufacturer


主站蜘蛛池模板: 亚洲无人区一区二区三区| 老少交欧美另类| 少妇熟女天堂网av| 人妻互换精品一区二区| 无遮挡色视频免费观看| 粉嫩极品国产在线观看| 无码不卡av东京热毛片| 欧美精品亚洲精品日韩传电影| av片亚洲国产男人的天堂| 久久婷婷综合缴情亚洲狠狠_| 伊人精品久久久久7777| 亚洲人成自拍网站在线观看| 四虎国产精品永久免费地址| 久久精品女人天堂av麻| 日韩欧美中文字幕公布| 国产自偷在线拍精品热| 久青草国产在视频在线观看| 熟妇人妻av无码一区二区三区| 狠狠躁夜夜躁人人爽天天69| 国产欧美日韩一区二区三区| 国产欧美日韩一区二区三区在线 | 国产精品国产av片国产| 国产精品丰满人妻G奶| 国产一区| 97视频在线精品国自产拍| 国产精品国产三级国产专i| 中文字幕一区二区三区精华液| 亚洲另类精品无码专区| 亚洲处破女av日韩精品| 日本高清www色视频| 精品综合久久久久久888| 中文字幕无码av波多野吉衣| 国内精品久久久久影院日本| 国产国产精品人在线观看| 中文乱码字慕人妻熟女人妻| 中文字幕一区在线观看视频| 国产无遮挡18禁无码网站免费 | 久久天天躁夜夜躁狠狠85台湾| 亚洲精品色情aⅴ色戒| 国产成人啪精品视频网站午夜| 人妻精品制服丝袜久久久 |