Double wall corrugated pipe construction manual

2025-03-19

Construction points of double-wall corrugated pipe

1. Excavation of trenches.

The net width of the bottom of the trench is generally determined according to the diameter of the pipe. When the diameter is greater than 450mm, the net width of each side of the pipe should not be less than 500mm. When the diameter is less than 450mm, the net width of each side should not be less than 300mm. In order to avoid the bottom of the groove being soaked in water, drainage measures must be taken before opening. If manual drainage is used, it can be excavated when the water level drops below the bottom of the groove.

Second, laying a cushion. Double-wall corrugated pipe construction contact, Hubei double-wall corrugated pipe

before the installation of the pipeline, the need to lay a cushion, the thickness should also meet the design requirements, for better soil foundation, the bottom of the groove laying a layer of medium coarse sand cushion can be, the thickness is generally 10mm; for poor soil foundation, you can use layered laying, the upper layer using medium coarse sand, the thickness should be greater than 50mm, the lower layer using a thickness of 100mm-150mm crushed stone.

III. Installation and connection. Double-wall corrugated pipe construction contact Hubei double-wall corrugated pipe manufacturer, Hubei AD Building Materials Co., Ltd.

HDPE double-wall corrugated pipe should be strictly inspected before laying the lower pipe. Pipes that do not meet the standards should be strictly prohibited from running down the pipe. The nozzles at the end of the pipe are divided into sockets and sockets. The sockets should be installed in the direction of water flow, and the sockets should be installed in the direction of countercurrent flow. When interfacing, first clean up the inner wall of the nozzle, and then apply silicone oil and other lubricants on the socket and socket rubber ring, and finally keep the central axis of the nozzle aligned. Double-wall corrugated pipe, wuhan pe double-wall corrugated pipe manufacturer.

Fourth, masonry inspection well

The bottom foundation of the well should be poured at the same time as the bottom foundation of the pipe; generally, the circular inspection well adopts the method of wall masonry, small inner seam and large outer seam to plug broken bricks into the outer ash seam to reduce the amount of mortar. The vertical ash joints of the upper and lower skin of each layer of bricks should be staggered; finally, the connection between the pipeline and the inspection well should be based on a flexible foundation, which is also different from traditional pipelines.

Five, closed water test

Double wall corrugated pipe construction manualthe1page

Double wall corrugated pipe construction manualthe2page

double-wall corrugated pipe construction contact, Hubei AD Building Materials Co., Ltd. is at your service, AD brand double-wall corrugated pipe, Jingjie double-wall corrugated pipe, Wuhan corrugated pipe, Hubei double-wall corrugated pipe manufacturer


主站蜘蛛池模板: 99精品在线| 国产亚洲精品久久久久秋霞| 久久人人97超碰超国产| 国产成人乱码一二三区18 | 国产在线观看无码免费视频| 国产精品亚洲专区无码唯爱网| 性色欲情网站iwww九文堂| 久久亚洲男人第一av网站| 日韩av无码成人无码免费| 肉岳疯狂69式激情的高潮| 日本三级香港三级三级人!妇久 | 国产亚洲精品麻豆一区二区| 国产精品久久久久久成人影院| 天天在线看无码av片| 久久99精品久久久久蜜芽| 熟妇高潮精品一区二区三区| 暖暖视频 免费 日本社区 | 久国产精品人妻aⅴ| 亚洲αv无码一区二区三区四区| 男女做爰真人视频直播| 天天澡天天揉揉av无码| 亚洲成av人片在www色猫咪| 色综合久久婷婷88| 国产精品人妻免费精品| 麻豆tv入口在线看| 人人超碰人人超级碰国| 亚洲一区在线观看尤物| 欧美精品亚洲日韩aⅴ| 久久99久久99精品中文字幕| 国产欧美二区综合| 中文字幕久久波多野结衣av不卡| 中文字幕日韩人妻在线视频| 亚洲伊人成综合人影院青青青| 日韩成人无码毛片一区二区| 大肉大捧一进一出视频出来呀| 色悠久久久久久久综合网伊人| 国产精品亚洲综合久久系列| 亚洲人成人网站18禁| 国产热re99久久6国产精品首页| 亚洲成色在线综合网站免费| 男女裸交免费无遮挡全过程|