Double wall corrugated pipe construction manual

2025-03-19

Construction points of double-wall corrugated pipe

1. Excavation of trenches.

The net width of the bottom of the trench is generally determined according to the diameter of the pipe. When the diameter is greater than 450mm, the net width of each side of the pipe should not be less than 500mm. When the diameter is less than 450mm, the net width of each side should not be less than 300mm. In order to avoid the bottom of the groove being soaked in water, drainage measures must be taken before opening. If manual drainage is used, it can be excavated when the water level drops below the bottom of the groove.

Second, laying a cushion. Double-wall corrugated pipe construction contact, Hubei double-wall corrugated pipe

before the installation of the pipeline, the need to lay a cushion, the thickness should also meet the design requirements, for better soil foundation, the bottom of the groove laying a layer of medium coarse sand cushion can be, the thickness is generally 10mm; for poor soil foundation, you can use layered laying, the upper layer using medium coarse sand, the thickness should be greater than 50mm, the lower layer using a thickness of 100mm-150mm crushed stone.

III. Installation and connection. Double-wall corrugated pipe construction contact Hubei double-wall corrugated pipe manufacturer, Hubei AD Building Materials Co., Ltd.

HDPE double-wall corrugated pipe should be strictly inspected before laying the lower pipe. Pipes that do not meet the standards should be strictly prohibited from running down the pipe. The nozzles at the end of the pipe are divided into sockets and sockets. The sockets should be installed in the direction of water flow, and the sockets should be installed in the direction of countercurrent flow. When interfacing, first clean up the inner wall of the nozzle, and then apply silicone oil and other lubricants on the socket and socket rubber ring, and finally keep the central axis of the nozzle aligned. Double-wall corrugated pipe, wuhan pe double-wall corrugated pipe manufacturer.

Fourth, masonry inspection well

The bottom foundation of the well should be poured at the same time as the bottom foundation of the pipe; generally, the circular inspection well adopts the method of wall masonry, small inner seam and large outer seam to plug broken bricks into the outer ash seam to reduce the amount of mortar. The vertical ash joints of the upper and lower skin of each layer of bricks should be staggered; finally, the connection between the pipeline and the inspection well should be based on a flexible foundation, which is also different from traditional pipelines.

Five, closed water test

Double wall corrugated pipe construction manualthe1page

Double wall corrugated pipe construction manualthe2page

double-wall corrugated pipe construction contact, Hubei AD Building Materials Co., Ltd. is at your service, AD brand double-wall corrugated pipe, Jingjie double-wall corrugated pipe, Wuhan corrugated pipe, Hubei double-wall corrugated pipe manufacturer


主站蜘蛛池模板: 精品深夜寂寞黄网站| 2022精品久久久久久中文字幕| 久青草国产97香蕉在线视频| 精品水蜜桃久久久久久久| 日韩欧美精品有码在线| 亚洲 欧洲 日韩 综合在线| 久欠精品国国产99国产精2021| 日本无卡无吗二区三区入口| 日韩人妻潮喷中文在线视频| 成 人色 网 站 欧美大片在线观看| 日本大胆欧美人术艺术| 99久久99久久精品免费看蜜桃| 成av免费大片黄在线观看| 亚洲综合色区在线播放2019| 欧美黑人性暴力猛交喷水| 中文文字幕文字幕亚洲色| 久久无码中文字幕久久无码app| 4444亚洲人成无码网在线观看| 国产精品亚洲精品日韩已满 | 色av专区无码影音先锋| 久久国产精品成人影院| 国产熟女高潮视频| 亚洲日韩中文字幕一区 | 国产女人久久精品视| 国产9色在线 | 日韩| 国产精品视频全国免费观看| 国产亚洲精品影视在线| 久久久精品人妻一区二区三区蜜桃| 天堂av无码av一区二区三区| 最近免费韩国日本hd中文字幕| 四虎亚洲国产成人久久精品| 呦男呦女视频精品八区| 亚洲а∨天堂久久精品| 九九在线中文字幕无码| 老熟女激烈的高潮| 色天使亚洲综合一区二区| 亚洲国产欧美中文手机在线| 无码人妻aⅴ一区二区三区蜜桃| 亚洲国产成人字幕久久| 国产日产亚洲系列最新| 2020精品国产福利在线观看香蕉|