HDPE Carat Pipe Scheme for Reducing Construction Earthwork

2025-08-19

In municipal drainage, industrial pipe network and other projects, the amount of construction earthwork has always been the core pain point that plagues the project party - the accumulation of earthwork and high transportation costs caused by large excavation not only slow down the construction period, but also may damage the surrounding environment. How to reduce the amount of earthwork excavation from the root while ensuring the performance of the pipeline? The HDPE carat pipe solution of AD Pipeline gives a targeted solution path.

In traditional pipeline construction, in order to ensure the bearing capacity, it is often necessary to lay a sand and gravel cushion layer with a thickness of more than 300mm, and at the same time reserve a wide groove for operation, which directly leads to the soaring amount of earthwork. The HDPE carat pipe adopts a three-layer wall structure design, the inner layer is smooth and drag-reducing, and the outer layer is wear-resistant. The middle layer greatly improves the ring stiffness through mesh enhancement technology (up to SN8 and above). This structural feature makes it unnecessary to rely on overly thick cushions - in practical projects, only about 150mm of sand and gravel foundation is required to meet the requirements, and this alone can reduce the amount of foundation earth excavation by about 40%.

flexibility is another major advantage of AD HDPE carat pipe. The material itself has good impact resistance and bending properties, and can adapt to minor fluctuations in the terrain or slight settlement of soft soil foundation. There is no need for large-scale leveling of the base. For example, in an old urban drainage renovation project, the original road surface is uneven. The traditional pipeline needs to be dug to a depth of 1.8 meters for leveling, while the use of AD carat pipe only needs to be dug to a depth of 1.2 meters, which directly reduces the amount of earthwork by 33%, and avoids disturbance to the surrounding building foundation.

The improvement of connection efficiency also indirectly reduces the amount of earthwork. The AD HDPE carat pipe adopts hot melt socket connection technology, and the interface is heated and fused to form a whole, without additional anti-corrosion treatment or large connection equipment. This fast connection method shortens the exposure time of the trench, and there is no need to reserve too much earthwork accumulation space for "waiting for connection" - the traditional pipeline trench needs to be 1.2 meters wide, while the carat pipe only needs 0.8 meters, the width of the trench is reduced by 33%, and the corresponding earthwork excavation volume naturally decreases.

What is more worth mentioning is that the AD HDPE carat pipe is compatible with non-excavation construction technology (such as guided drilling). In the busy main road or green belt area, there is no need to excavate the whole line, only the work pit needs to be excavated at both ends, and the pipeline is pulled to the ground through the drilling rig. In an urban trunk road renovation project, after using this scheme, the amount of earthwork was reduced by 75% compared with traditional excavation. During the construction period, road traffic was not significantly affected, and environmental damage was minimized.

As the core support of the scheme, the quality control of carat pipes by AD Pipeline runs through the whole production process: from the screening of imported HDPE raw materials, to the precise control of temperature during the extrusion process, to the ring stiffness and pressure resistance testing of each pipe to ensure stable product performance - which is also the fundamental reason why it can "reduce earthwork with confidence".

From structural design to construction adaptation, the AD HDPE carat pipe scheme has achieved a systematic reduction in the amount of earthwork through four paths of "cushion, suitable terrain, fast connection, and non-excavation". In actual projects, the solution can reduce the amount of earthwork by an average of 30% -75%, while taking into account the construction period, cost and environmental benefits. For construction parties pursuing "high efficiency, low carbon and economy", this is not only a pipeline choice, but also a solution to optimize the whole process of the project.


HDPE Carat Pipe Scheme for Reducing Construction Earthworkthe1page

主站蜘蛛池模板: 国产又大又硬又粗| 国产精品igao视频网| 午夜精品久久久久久久久| 999精品色在线播放| 狠狠亚洲狠狠欧洲2019| 久久久精品免费| 亚洲人av高清无码| 欧美成人欧美va天堂在线电影 | 日韩加勒比无码人妻系列| 又大又粗又爽免费视频a片| 国产真实交换多p免视频| 国产肉体ⅹxxx137大胆| 精品国产yw在线观看| 日本另类αv欧美另类aⅴ| 少妇的肉体aa片免费| 久久www免费人成精品| 国产精品天天狠天天看| 强迫大乳人妻中文字幕| 久久99er精品国产首页| 中文字幕免费不卡二区| 亚洲精品久久国产精品浴池| 国产成人精品午夜福利| 亚洲顶级裸体av片| 18禁h免费动漫无码网站| 亚洲综合无码精品一区二区| 亚洲AV秘?无码一区二区三动图| 天天躁日日躁狠狠躁av中文| 亚洲视频日韩视欧美视频| 奇米综合四色77777久久| 一本一久本久a久久精品综合| 久久久精品人妻一区二区三区| 亚洲欧美自拍色综合图| 少妇下面好紧好多水真爽播放| 狠狠狠狼鲁亚洲综合网| 2021亚洲国产精品无码| 精品国产乱码久久久久久影片| 精品日本一区二区三区在线观看 | 噜妇插内射精品| 亚洲人成色77777| 人妻中文字幕av无码专区| 成年午夜免费韩国做受视频|