What is the reason for the failure of the double-wall corrugated pipe closed water test?

2025-05-05

In municipal drainage engineering, the closed water test of double-wall corrugated pipes is a key link in testing the sealing of pipelines. However, the failure of the test occurs from time to time, which not only affects the progress of the project, but also may cause hidden dangers of leakage. Combined with construction practices and industry standards, the failure of the closed water test is mainly caused by the following three types of problems:

1. Pipeline socket installation defects

1. Interface sealing failure Socket installation is not in place is the most common problem. For example, the socket of DN300 pipeline should be inserted into the socket depth of not less than 120mm. If the actual insertion depth is only 80mm, the rubber ring will not be fully fitted and a leakage channel will be formed. In addition, the offset of the installation position of the rubber ring (such as the third ripple not embedded in the socket) or the use of non-matching sealing rings (such as SN8 pipeline misuse SN4 sealing ring) will destroy the sealing performance.

2. If the crowbar is used to forcibly push the pipeline connection during the construction of the interface damage, it is easy to cause scratches on the inner wall of the socket or depressions on the outer wall of the socket. A project once used mechanical brute force to connect the DN600 pipeline, resulting in a 3mm deep scratch at the interface, and the water seepage exceeded the standard by 3 times during the closed water test.

2. Improper control of the construction process

1. The foundation treatment is not up to standard and the trench is not backfilled according to the specification after overdigging, which is the main reason for the settlement of the pipeline. For example, the bottom of a trench in a project was overcut by 30cm, only backfilled with plain soil and the compaction was less than 90%. During the closed water test, the pipeline appeared 15mm uneven settlement, and a 0.5mm crack was generated at the interface.

2. Backfill quality defects The axillary corner of the bottom of the pipe is not filled with medium coarse sand, or the backfill soil contains stones with a particle size greater than 50mm, which will destroy the force balance of the pipeline. A project was mixed with concrete blocks in the backfill, resulting in local compression and rupture of the pipeline. The water leakage during the closed water test reached 1.2L/(min · km), far exceeding the allowable value of the specification by 0.3L/(min · km).

3. Materials and test preparation issues

1. Pipe quality defects Some manufacturers in order to reduce costs, the quality is not up to standard.

2. Test operation is not standardized If the pipeline is not fully soaked before the closed water test, it will affect the test results.

Water Closure Test Qualified Operation Guide

Prepare

Before the test

Use 1:3 cement mortar to seal the nozzle, maintain for more than 3 days

The water level rises to 2m above the top of the pipe, if the upstream well depth is insufficient, the height of the wellhead shall prevail

Check the appearance of the pipeline and repair the visible cracks

Test process Control

Soaking time is not less than 24 hours

Water seepage measurement time 30 minutes

Measured water seepage "GB50268-2008" Allowable value (such as DN300 pipe allowable water seepage 0.3L/(min ? km))

Leakage repair plan

Slight leakage: use HDPE electrode hot air welding, with geotextile wrapping

Serious damage: remove the damaged section, replace the new pipe and reconnect 117277984 Interface problem: remove the interface, replace the sealing ring after cleaning up the debris

Hubei AD Building Materials: Professional double-wall corrugated pipe solution provider

As the source manufacturer of Hubei HDPE double-wall corrugated pipe, Hubei AD Building Materials Co., Ltd. strictly implements the ISO9001 quality management system, and the product ring stiffness reaches SN8 level far exceeding the industry standard. For the closed water test problem, the company provides:

Technical support: free welding training and closed water test guidance

Emergency service: 24 hours response, 48 hours to arrive at the site to deal with leakage

Quality assurance: pipe quality assurance 50 years, closed water test unqualified unconditional return

If you need technical consultation or product procurement, please call the service hotline: 17399989993.

What is the reason for the failure of the double-wall corrugated pipe closed water test?the1page

主站蜘蛛池模板: 久久狠狠爱亚洲综合影院| 午夜福利视频合集1000| 免费无码又爽又高潮视频| 自拍偷区亚洲综合激情| 精品无码国产一区二区三区麻豆 | 人人爽久久涩噜噜噜av| 亚洲熟妇中文字幕日产无码 | 99久久99久久精品国产片果冻| 动漫av纯肉无码av在线播放| 男人的天堂在线无码观看视频 | 四虎影视www在线播放| 久久精品午夜福利| 黑人大战中国av女叫惨了| 牲交欧美兽交欧美| 国产人妻777人伦精品hd| 亚洲国产成人无码专区| 99视频在线精品免费观看6| 午夜性色吃奶添下面69影院| 亚洲中文字幕琪琪在线| 成人午夜精品无码一区二区三区| 黑人巨大videos极度另类| 国产午夜鲁丝片av无码免费| 成年免费视频黄网站在线观看| 无码中文字幕乱码三区日本视频| 美女露出奶头扒开尿口免费网站| 无码中文人妻在线三区| 夜夜夜夜曰天天天天拍国产| 亚洲十八禁| 久久大香萑太香蕉av| 99久久无码一区人妻a黑| 中文字幕久久精品一区二区三区| 日韩人妻精品一区二区三区视频| 在线观看国产精品乱码app| 亚洲精品人成网线在播放va| 国产无套粉嫩白浆在线观看| 最新亚洲精品国偷自产在线| 午夜理论片yy8860y影院| 国产国产人免费人成免费视频| 99亚洲男女激情在线观看| 国产亚洲欧美日韩亚洲中文色| 男男19禁啪啪无遮挡免费|